|
Fratto Engineering, Inc. Plans for Growth on Target Fratto Engineering continues on pace acheiving sales goals by growing the company with new projects earned from satisified cuomers. Arlington TX (PRWEB) March 11, 2006 -- Fratto Engineering, Inc. (FEI) continues to earn new projects from former customers based on their outstanding performance.
Among a list of newly awarded contracts for Fratto Engineering Inc. (FEI) is the Veteran's Administration in Amarillo, Texas. The assignment awarded to the engineering group is to upgrade the electrical systems of several of the VA buildings.
Another new FEI contract, also in Texas, is with an Outpatient Surgery Center in Waco. This job is to commission the mechanical and electrical systems. Also under the healthcare banner, are contracts to design a new Operating Room for the Freeman Medical Center in Joplin, Missouri, and the construction of an Emergency Room Lobby which is about to get under way for Parkland Hospital in Dallas, Texas.
These newly awarded projects follow on recently completed or close to finishing assignments, including a CT Scanner for Doctor's Hospital in Dallas, Texas, a new Cardio Vascular Operating Room at Cypress Fairbanks Medical Center and two Endoscopy Centers in Dallas.
Another project on the drawing board is the design of a new 75,000 SF replacement hospital in Lamesa, Texas.
Fratto Engineering continues to add resources to accommodate an ever increasing number of satisfied customers returning with new projects. The expansion and addition to staff in 2005 accommodates FEI’s needs for the first half of 2006. FEI’s growth is consistent with their long term plan that includes contingencies allowing them to be flexible in addressing new opportunities.
More information on FEI is available at www.frattoeng.com or by calling Mark Fratto at 817-461-2337.
###
|
© Copyright 1997-2008, Vocus PRW Holdings, LLC. |