|
WindFire Energy anounces creation of worlds first Ultraconductor
Ultraconductor Research completed and manufacturing design currently being created
Research Release - November 1, 2002 - (Canon City, CO) WindFire Energy (A Division of T-Lynn Enterprises) is pleased to announce that the research on the Power Core Ultraconductor (Core) has been completed, and the manufacturing process has been developed. The Core Design Phase (Phase 2) was expected to take 4 months to complete, but was completed in only one and a half (1 1/2) months. The Core manufacturing specifications are being created from this research. After the specifications are completed, they will be reviewed and approved. Here are some of the specifications that have been determined:
Power Input Required - None
Power Output - .5~1000 Volts
Operating Temperature Range - -300 to 400 Degree F
The power amount available from the Core is dependent on the manufacturing design used. This places us in the position to start developing the manufacturing line to produce the power cores within 6 months. Several locations are being considered for the manufacturing plant location, and the decision is to be announced on January 13, 2003. The cells that will be developed first are in the portable device market, thus creating demand for the cores, and allow for real-time testing on devices already on the market. After successful testing in this market, we will release the core design specifications to manufactures to directly integrate the cores in their own devices (lifetime power source). For further information please contact us at info@windfireenergy.com.
|