Milwaukee, WI (PRWEB) December 6, 2010
The Bill of Material Manager, developed by Progressive Edge, is designed to relieve your Made2Manage users of the menial tasks which accompany Bill of Material (BOM) management. There are a number of enhancements over the standard Made2Manage product. First of all, you can work will all of the Made2Manage BOM Types (Standard, Job, Order, and Quote) all from the same intuitive interface. Second, the Bill of Material Manager supports an “Integrated Routing”, so you see the Routing indented right along with the BOM information. Third, BOM Maintenance is performed via an Excel-like interface, with Drag and Drop capabilities to “pull” sections (including the routings) from any other BOM in the system. Finally, an Import capability allows you to create new BOM’s from any CSV type file, without typing.
Stephen Martin, the Engineering Manager at PSI, explains that two features in particular have contributed to the productivity gains. “The Importer Module allows us to import a large number of sequences without having to type each one separately. And because it imports from a CSV file, we can leverage this capability across our three CAD packages (Microvellum, Mechanical Desktop and Inventor).” All major CAD packages, including Solidworks and Inventor, support exporting to CSV files. The Bill of Material Manager comes with an Import Wizard which walks you through the process of importing that CSV file into the BOM Manager; a very simple process.
The ability to import BOMs into Made2Manage is a big deal in itself, but the Bill of Material Manager also assists in managing the BOMs once they are already in your system. Stephan continues, “The Where Used capability has also made us more productive. It allows for the specification of more than one different component at time, so that a list of parents which use both components (or optionally only one of the components) can be displayed. This allows us to quickly see patterns in material usage. For instance, I could quickly find out which other right ends might be used with a selected left end.”
“The Bill of Material Manager is all about Productivity.” explains Kenneth Roy, President of Progressive Edge. “Generally one of your highest valued resources, your Engineers and Project Managers, have been forced to perform clerical duties to get the information into and out of your ERP Package. We designed the Bill of Material Manager to automate these tasks and free them up to perform their true jobs. At Progressive Edge, we understand the less time spent maintaining an ERP system, means more time using it.”
About Panel Specialist, Inc.
Panel Specialists is a manufacturer of conventional and fire-rated construction products including laminated panels, partitions, wall systems, and residence hall furniture. Their plant is located in Temple,TX and serves customers throughout the continental U. S. Panel Specialist has been using Made2Manage for about 8 years. They have an average user count of 25 Made2Manage users, with 4 in the Engineering Department.
About Progressive Edge, LLC.
Progressive Edge has been providing services and alternative solutions to Made2Manage users since 1999. These services include consulting services, custom programming services and applications like the BOM Manager and the Cost Calculator. Progressive Edge has had the privilege to provide services to over 80 companies using the Made2Manage ERP Software.
Made2Manage is a trademark of Consona Corporation. Progressive Edge is not affiliated with Consona Corporation or Consona ERP.
###