New OnTrak Program Reduces Lamination Development and Production Costs

Share Article

The OnTrak™ start-to-finish lamination process development and production program enables companies to efficiently develop new laminating processes, create proof of concept products, and meet final laminating production needs. The turnkey OnTrak program can reduce overall laminating costs, speed time-to-market, and in many cases eliminate the need for investment in lamination capital equipment.

News Image

PATERSON, NEW JERSEY: Glenro, Inc. of Paterson, New Jersey, is introducing a new industrial lamination program. Designated the OnTrak lamination process development and production program, this new program enables companies to develop new and better lamination processes while reducing overall lamination costs. The program benefits companies who laminate materials such as fabric, nonwovens, metal foils, foams, filters, composite panels, and wood products.

The OnTrak program consists of three phases: (1) the Process Development Phase; (2) the Proof of Concept Phase; and (3) the Production Phase. In the Process Development Phase, Glenro lamination engineers evaluate lamination requirements and then conduct a variety of tests to develop the optimal lamination process. Glenro uses its unique high-efficiency flatbed laminators to develop and determine the best process for each laminate material. During the development process, each of the important variables--pressure, temperature, time, and adhesives—are optimized for the materials being laminated.

In the Proof of Concept Phase, Glenro manufactures products using the optimal laminating processes developed in the Process Development Phase. These manufactured products can then be assembled to build a functioning prototype product. This fully functional product can in turn go through a series of real-world tests under the exact environmental conditions of the final application.

In the Production Phase, Glenro will run the materials to be laminated on in-house lamination lines in Maysville, KY—the same lines that were used to develop and optimize the laminating process. That procedure eliminates costly and time-consuming “line recalibration”—and ensures that the finished product is identical to the product developed in the Proof of Concept Phase. The output of the Glenro lamination lines are Production Units—ready to be sold or integrated as a component into other products.

In some cases the OnTrak program can complete the new lamination development start-to-finish cycle in as little as 3 weeks.

Glenro offers a complete range of contract laminating services. Utilizing the OnTrak program and Glenro lamination lines for Production runs allows companies to build and sell actual products—and evaluate their market—without a capital investment in lamination equipment.

For more information, contact Tim Caproni at 606-564-4778 or visit http://www.contractlaminating.com

Media Contact
Tim Caproni
ontrak(at)glenro(dot)com
Phone: 606-564-4778

Glenro, Inc.
39 McBride Extension
Paterson, NJ 07501
1100 E Third St.
Maysville, KY 41056
http://www.contractlaminating.com
http://www.glenro.com

Share article on social media or email:

View article via:

Pdf Print

Contact Author

Tim Caproni
Glenro
+1 606-564-4778
Email >
Visit website