Perforated Tubes, Inc. Adds 150-Ton Minster Mechanical Press
Ada, Michigan (PRWEB) November 26, 2015 -- A brand-new 150-ton Minster Mechanical Press will soon enhance the capabilities of Perforated Tubes, Inc. to develop custom perforated tube solutions for industries throughout the world. The company's new Minster press, is to be installed in early December.
The new Minster press enables the team at Perforated Tubes to perforate more quickly and efficiently, as well as to process specialty stock with a computer-controlled feed.
"We have a total of eight presses, and the Minster is now one of four presses we have of this size and capability," explained David Doezema, vice president of Perforated Tubes. "Our investment in the Minster press is further proof of our company's ongoing commitment to the use of state-of-the-art equipment in serving our customers."
For more information on perforated metal tubing, please see http://www.perftubes.com, call 616-942-4550 or visit or write to Perforated Tubes at 4850 East Fulton Street in Ada, MI 49301-9108.
Perforated Tubes, Inc. takes pride in its innovation, timely delivery and high-quality products. The company provides numerous industries with perforated tubes to be used in a wide variety of applications, including high-pressure filtration and air filtration systems as well as components for U.S. military aircraft and ballistics. Its engineers have worked on such studies as the Olympic Torch used for the 2006 Torino Games and the Mars Rover.
David Doezema, Perforated Tubes, Inc., http://www.perftubes.com, +1 (616) 965-3282, [email protected]
Share this article